EPS Room 102 Lobby Renovation
 
Start:1/04 Const:3/09 End: 4/09
The $2.5M EPS Lobby Renovation was designed to provide a gathering place for students, with interactive video displays of various engineering disciplines.
| Architect: | Contractor: | 
|---|---|
| CTA | Spring Corporation | 
